Wednesday, December 21, 2011

On the Appearance of Being Bah-Humbug-ish

I swear it's not me being a big ol' bag of bah-humbug this year. I've never been particularly good about Christmas shopping, always delaying until the last minute, and then floundering with finding good gifts for friends and family. I've had a few good moments of inspiration, when I was able to come up with blindingly fantastic gifts (or at least, I thought they were) that everyone seemed to enjoy. A lot of them had to do with being poor. One year, when I lived on a farm, I made gift bags of goodies from stuff I had grown in the garden...ropes of dried peppers, homemade relish and jam, canned strawberries and syrup. I made rag rugs one year, from the drapes that used to hang in my paternal grandparents' home.

And one year, I came up with the "Treasury of Thoughts." It was sometime in the late 1990's and I found a thrift-store glass dish with four partitioned sections. I picked up some little natural trinkets (seed pods, cool pebbles, sea shells) and placed them in each of the four sections. The accompanying card explained the idea:
"I've given you a Treasury of Thought this year. Each item in the dish represents an individual thought or action. The start-up items in the dish now are labelled as some things I think are good thoughts, actions and/or memories.
My  idea for the Treasury of Thoughts is that, as you go through the day, when you have a good thought or do something you're proud of (but that isn't great and grand enough to tell the world about) you can move a "thought" from one compartment to another to personally commemorate that good thing.
This shouldn't be a static collection of "thoughts" though. You can pick up your own things to put in it, or ask friends to collect small things for you throughout their travels.
There are a few guidelines for the Treasury:
1.  No "thoughts" can be purchased ones; they all need to be found, free.
2. Don't keep track of what thought you put in what compartment, or in moving particular ones to particular places.
3. Put it somewhere you'll see it at least once a day (preferably more), but that's out of the way of the four-footed furry feline.
I hope all this isn't too goofy, and I wish you lots of prosperity in your Treasury."
It was definitely cheesy, but it was cheap and thoughtful, and my mom kept hers for the rest of her life. Today, I think the best thing about it is that I can cheerfully drop all the thought trinkets in the yard, put the dish in the thrift store pile and compost the card...because the Treasury already served its purpose.

Then there were the years, though, that I just flopped. So sorry, family, for those ridiculous salt cooking blocks a coupla years ago. I don't think anyone has used them yet. Or the fugly swirly pink pastel pottery bowl that I found tucked away in my mom's cupboard. I think the pattern of giving useless crap started when I was very young. For probably the last ten years of my mom's parents' life, I gave my grandmother pretty soaps. They piled up in a basket on the bookshelf in her nursing home room, never used, gathering dust and diffusing their floral scents heavily into the air. But I had to give them *something.* Or so I thought.

This year in particular though, I'm just tired of stuff. I don't want to give people crap. I think it has a lot to do with cleaning out my mom's house and getting it ready to rent. I sent my sister a frantic email earlier in the week.  "Can we set up a time to call, and go through stuff? I don't know the provenance of a lot of this stuff and I feel like I'm gonna pitch out the family heirlooms if I try to do it by myself. I found some t-shirts that I made at the Early Learning Center [where I went to *pre-school!!*] (hideous, but just the kind of stuff mom would keep). And some beautiful aprons that look handmade. Sorry I've got such a horrible memory...wish I could do this on my own..." She responded sensibly and with just the kind of practical advice I needed to move past feeling overwhelmed.

Part of my frustration is that Mom had some lovely stuff that meant a lot to her. But I've already got a house full of stuff. My sister already has a house full of stuff. We already decided which pieces of furniture are going to whom. And luckily, I have the space to store stuff at my house in Maryland that does not have an immediate destination. But the other stuff...what to do with the blankets stored in the cedar-lined blanket chest that I remember piled on the bed as a kid? or the pots and pans Mom cooked with for the last 50 years? or the art that she had hanging on the wall from when I was eight, and her granddaughter was four? or that damned fugly pink swirly pastel pottery dish (actually, that one's easy...it's going to the thrift store! But you get the idea)?

Maybe cleaning out the house at Christmas-time wasn't the best idea. I kinda feel like I'm using it as an excuse for being too lazy to give any Christmas gifts this year. The reality is, though, that I'm over *stuff* for the sake of *stuff.* If I find myself inspired by something I see for someone, or have a great idea for making something, or a gift certificate that won't languish unused in the back of someone's junk drawer, I will GLADLY bestow presents on my friends and family. You may find yourself getting your Christmas present in August, though, because when I find something I think you'll like, I don't want to *wait* to give it to you...where's the fun in that?!

Unfortunately this year, I'm just not feeling inspired. My one inspiration is to sponsor any family (Amy, that means you and Ally, too) member that wants to join the Gravy, Wine & Steve team for the Greensboro Rugged Maniac race. It's sometime in April this year. Uncle Heathen and Aunt JB, you're getting race slots whether you want them or not...you're the backbone of the team. Cameron, are you in? Jay, Alex? Does it fit with your schedule?

See, I'd *WAY* rather give stuff like this!

Saturday, December 17, 2011

A Molehill of Meant-Tos

I meant to write a post long before now, maybe one about my family extravaganza Thanksgiving weekend.
I meant to post on Fleet Feet Roanoke's Facebook page about how awesome my new running shoes and pants were to wear during the Hot Chocolate 15k race. My cousins, Robin and Jane, and Robin's husband Blaine were so helpful!
I meant to get more done around the house before I left for nearly six weeks.
I meant to coordinate the work that was done better, so that I didn't have the snafus that happened. Like not being able to install the vapor barrier in the crawl space because it was too wet, and having to reschedule the tilers because the other renovators weren't done in the kitchen yet.
I meant to make some more revisions to my group's Negotiating Conflict workbook before turning it in.
I meant to finish reading Don Kettl's book, The Next Government of the United States, before the last day of class.
I meant to run more than I did...but found myself profoundly lacking in motivation when the temperature dropped below 50 degrees.
I meant to do some amount of Christmas shopping.
I even meant to make some preparations for coming out to Hawaii, like calling movers for quotes and making an appointment with a property manager.

But none of that happened. And the world didn't come to an end. I did manage to get all my papers done, projects turned in and the house cleaned before I left. Some days that's enough.

Friday, November 18, 2011

Program Reviewer Philosophy

I posted my Command Philosophy a while back. I wrote the first draft of that philosophy almost ten years ago, when I was in Prospective Commanding Officer / Executive Officer (PCO/PXO) School before heading to be XO of WASHINGTON (the school requires both PCOs and PXOs to write one). It got dusted off and updated when I went to MAUI, and again before KISKA. But really those were just refinements, changes to reflect the different operating areas. It gives me some sense of peace that the underlying ideas didn't change...like maybe I really *do* have a coherent philosophy, or set of core sensibilities that help guide me through all types of situations.

Now I'm going into a job for which I feel very ill-prepared, a little overwhelmed and a lot nervous. It's been since I first reported to BOUTWELL that I was facing a new set of responsibilities so far outside of my comfort zone. I feel the need to consider a set of principles, maybe rules of engagement for being a Program Reviewer. Since I'm familiar with the Command Philosophy concept, I'm going to call it my Program Reviewer Philosophy. As I first started thinking about this idea, it felt awkward, like I should have some experience in the job before having the hubris to assume that I knew what I was doing. Then I remembered that, as I wrote my initial Command Philosophy, I didn't know what I was doing then either...I had never been an XO, I just had a general sense of what I was getting myself into, and I wrote it kinda blindly. It worked out okay then.

A Command Philosophy is typically published to the entire crew, posted in main pass, and discussed with officers, chiefs and Department Heads. I've even had supervisors ask me for a copy so they know more about where I'm coming from with leadership decisions. But as of right now, I'm not really sure how broadly I'll share this once I get to the office. From my understanding, there are three general groups of people I'll be working with: my supervisors, my peers and my Program peeps (is that too impertinent?). I guess it depends on my reasons for developing it in the first place. I see this as something that I'll hang prominently on the bulkhead in my cubicle, so that as I sit in front of my computer screen, my eyes will not fail to miss it, and I am constantly reminded of why this is important to me, what my priorities should be and how I should conduct myself even when the pressure is on high. A self-accountability tool, if you will.

My Philosophy

…is that the Coast Guard as an institution is important to me. I joined the Coast Guard to perform great and worthy, heroic and patriotic duties, for the sea stories I get to tell my family and friends, and to do things that not many other people get to do. Those experiences, the people I've worked beside, and the opportunities yet to present themselves make the Coast Guard an organization that I want to fight for.
…is that a job worth doing is worth doing to the best of my ability. At the end of my tour, I intend to look back and be able to honestly tell myself that I faced every task and challenge to the best of my ability. This is the only way the sacrifices I have made will have been worthwhile.

My Guiding Principles
  • One Team, One Fight: We are all on the same side, even when individual programs are facing budget cuts and high priorities conflict. A deep and abiding respect for all my shipmates will remind me to look beyond any moments of contention and focus on the larger goal of taking care of the Coast Guard. 
  • Innovative Solutions and Systems Thinking: We function in an increasingly complex and networked world. "That's the way we've always done it" begs for a closer look. A passion for understanding expanded scopes of influence and underlying dynamic processes will allow for development of better, more creative options that offer effective long-term solutions instead of unconsidered tinkerings. 
  • Checking the Unengaged Side of the Ship: Just as the XO stands on the unengaged bridge-wing to check for any unanticipated hazards, a constant awareness of the bigger picture into which my small portion fits is necessary to ensure the overall positive contribution of what I am doing. Thorough analysis, based on sound data and process-based logic, is a critical risk mitigation strategy that will enable solid recommendations to percolate through the noise.
Critical Skills
  • Communication: I must be able to respect my shipmates enough to LISTEN to them and take the time to understand what they are saying to me, rather than hearing what I think they should be telling me. I must also be able to clearly and concisely present my own well-articulated arguments to reduce confusion and not waste anybody's time. Success depends on my ability to take in and disseminate information.
  • Acceptance of Risk: Times are changing too fast and too dramatically to allow process calcification to paralyze our ability to respond. New ways of doing things will not always work and sometimes my suggestions will fail, but I must have the courage to confidently promote innovation in pursuit of improvement. 
  • Acceptance of Consequences: When my ideas and actions do not stand up to the high standard of effective implementation, I must have enough personal resilience to withstand the fall-out. I protect myself against any cataclysmic negativity by relying on my Guiding Principles.
Questions to Ask...Every Time
  • Am I focusing my listening on the intended message? Am I saying what I mean to say, as concisely and clearly as possible?
  • What impact does this option or decision have on:
    • Crews in the field? Support staff manning the Help Desk?
    • Organizational ability to execute the mission?
    • Long-term asset health and resource availability?
  • Where is my ego in this?

Tuesday, November 8, 2011

Orders....Or, The Next Challenge

This transfer season has been more tumultuous than any other I've been through. The only other one that might be even somewhat comparable was when I was leaving HAMILTON. I had successfully screened for command, and asked for nuthin but 110s. I was cocky enough to think that it was just a matter of which one I would get.

It was about a week or ten days before Christmas. Suppo and I had left the boat right when liberty was piped to go shopping for a Christmas wine and cheese party I was hosting. We stopped by the L&L Hawaiian Drive-In just outside the 32nd St Gate of NAVSTA San Diego to get some lunch to sustain us. I ordered the kalbi rib lunch plate (with rice and mac salad). I had grease and teriyaki sauce all over my face and hands when my phone rang. It was a 202 area code...during transfer season, that only means one thing--the detailer.

Breathe, Charlotte, remember to BREATHE.

I (somewhat) calmly wiped my hands so I could answer the phone, chatted with the Assignment Officer/detailer (AO) for a few minutes, long enough for him to tell me I was going to MAUI. I had enough wits remaining about me to thank him for the call. I hung up. And then almost hyperventilated. I don't think I stopped saying omg for about two days. Suppo was very patient with me that afternoon.

This year my e-resume was due mid-August, I think, because I was putting in for a Special Assignment, as a Program Reviewer at CG-821. I duly submitted my wish-list, and then really didn't think much more about it. I knew I was going somewhere at HQ, so why fret about the details (anybody that knows me, knows that is a *flat-out* lie...of course I worried about it!!). All there was to do was wait.

Then the AO called me the first time. I spent a couple of days shaking my head in wonderment that a) he offered the opportunity and b) I turned it down.

Then he called back about a week later (at this point, I was starting to recognize his phone number on caller ID...kinda a weird feeling). He asked me if I was interested in putting in for a high-profile Aide job. Ok, so when the AO calls you *TWICE* to push special assignments, you don't say "no" a second time. I said yes, and started a crazy roller-coaster ride that ended this week with PCS orders for my payback tour.

As the AO explained the process to me, my file would be forwarded to the appropriate office and they would be in touch about an interview if  they were interested. He made it sound like the turn-around time was going to be pretty fast. Somehow, I think our definitions of "pretty fast" were slightly divergent. To me, "pretty fast" should mean, I don't know, maybe two or three days. So four days went by, then a week went by, and I still hadn't heard anything. I started telling myself that the office wasn't interested in me, my record wasn't good enough, I should have known better than to expect an interview, the whole thing was so far-fetched anyway. Sadly, I let myself get pretty down about it.

In the interim, the Deputy at CG-82 contacted me, requesting I call him for a phone interview. I phoned him back the next day, and we chatted for about 25 minutes. He asked a little about me, but also spent plenty of time making sure I knew what the Program Reviewer job was all about. He was very forthright about the pressures of the job, lots of responsibility and long hours. He gave me the names of a couple of people currently in the office, and encouraged me to talk with them about what they do.

But then, a couple of Tuesdays ago, I got an email. The subject line read: "Interview for ______ Aide." The first line: "Congratulations..." I called my sister. I called my friend who had been an Aide. I think I might have even shouted it from the rooftops. I could barely contain my excitement.

I actually prepped for this interview. I talked to my friend to get her perspective on being an Aide, about what kinds of questions they might ask, about what kinds of answers might be appropriate. I really appreciate her patience with my ignorance and naivete...I'm not sure it would have occurred to me that my involvement in UCMJ proceedings weren't appropriate and contributory topics of conversation for an interview. And she was honest enough to advise me that I needed to be upfront with the interviewers about the tattoos...an Aide's job is to make sure there are no surprises, so showing up the first day of a high-visibility job with a full sleeve tattoo the bosses didn't know about kinda sets a Girl up for failure. With that in mind, I went into the interview with a somewhat fatalistic attitude of presenting my best effort, to hell with the results.

The interview was last Tuesday. I was nervous! I arranged to use a landline at the School of Public Policy so that I wouldn't have to worry about the call being dropped by my cell carrier. I dressed professionally to give myself some confidence and remind my self to maintain my professional persona (no cussing allowed!). I wrote out key points to questions I thought they might ask so I wouldn't stumble (as much) over my answers. And I wondered how I went from not even knowing I wanted this job to it really, really mattering to me.

The interview was scheduled for 1600. About 20 minutes beforehand, the current Aide called me to tell me they were running behind, some things had come up; would I be able to move the call to 1700? Umm, of course, no problem. And then I (tried to) read some of the articles assigned for class the next day. It was a little anti-climatic. But 1700 finally ticked around on the clock, and I made the call.

I thought the interview went very well. The interview panel asked me some of the questions I thought they might, but then come up with a few others that I wasn't expecting. I was able to put together cogent responses to all of them. One made me nearly choke up: the CAPT asked what my crew would have said my Command Philosophy was. I told them about the BM2 that, as he left MAUI, told me he really appreciated how I stuck to my Philosophy, relating events back and referring to it on a regular basis. Made me miss my crews! And then they asked what was the one single scariest moment I had faced underway--that would have been playing chicken with a 650-foot container ship, speeding 18 knots straight at the oil platforms, and crossing his bow at about 400 yards to try to turn him away from the security zone. The crew responded so fantastically to that situation , and were totally ready to react to the threat if had fully manifested.

At the end of the interview, the panel told me that I should hear something by the end of the next week. Ugh!! I HATE waiting.

Turns out I didn't have to wait nearly that long. When I got home from class the next day, I had an email from the Deputy at CG-82 asking me to call him. I called him first thing the next morning; he told me I was on the short list for Program Reviewer but he wanted to check with me to see if I was still interested and make sure I had the opportunity to talk with someone in the job. We made arrangements for me to visit the office the next day (I was headed to HQ for something else already).

I'm glad I went to visit CG-82. I met both the Deputy and the CAPT. The Deputy talked about how much responsibility the Program Reviewer had, both in terms of the budget and some aspects of policy for their programs. Millions of dollars, the last check to make sure messages are consistent, briefing ADMs going to testify before Congress...very high-powered stuff. Yup, it kinda intimidated me, and I told him that. He looked at me a little quizzically, and asked, weren't you CO of a ship? Yeah, but somehow it just seems different. The consequences of mistakes just seem so much more daunting. But as those words were coming out of my mouth, I realized just how inconsistent they were. As CO, peoples' *lives* are in your hands, millions of dollars of assets and equipment are at stake. What's the difference between the levels of responsibilities again? I guess after two years as CO, that mantle of responsibility finally settled more comfortably on my shoulders.

Later that evening, my phone rang again...202 area code (it's not quite so nerve-wracking now that I live in the DC area, but still gives me pause). It was the AO telling me if I was still interested in the Program Reviewer job, he was ready to pencil me in for it. I asked about the Aide job; he said while the interview panel liked me, there were other candidates they were considering.

Well, hell.

Once again, I had the wherewithal to thank the AO for his call and tell him I was still interested in the Program Reviewer job. And then I started to sulk. Just a little bit, and not for long. But I had already had kind of a crappy day. Frustrations with the dry cleaner (four visits required to get O4 stripes on my Bravo jacket), losing the battle with the weedeater (thankfully there were no injuries involved and I eventually won the war...the next day), not working out or eating particularly well lately...all conspired to put the AO's call in the worst possible light.

After gaining a small margin of perspective with the help of my sister and friends, I came to realize the Aide job would have been a poor fit for me. It *absolutely* would have been super-cool fun -- all the traveling, meeting some of the country's top leadership as well as all the Coasties at so many different units, getting the high-altitude big picture of the Coast Guard; and I would have done a perfectly acceptable job at it. But it just wasn't the right fit. It reminds me a little of my friend Rickey's attitude about campgrounds that didn't allow dogs. He had a *big* dog back in the day, and while it was sometimes frustrating for him to have to drive on down the road past those campgrounds, he always felt that rule probably kept him out of some places he wouldn't have been so welcome anyway. I'm only kinda saying that my tattoos are like Rickey's dog, keeping me out of places I have no reason to be anyway. They're only the physical manifestation of an individualism that I'm not ready to change, or obscure, or censor...but not flaunt or obnoxiously brandish about, either. I see lots of days wearing a woolly-pully in my future. I might even have to get one of the cardigans.

So, my orders are on the board for Program Reviewer at CG-821. I would be *LYING* if I said I wasn't nervous. I'm *very* nervous. Like, "how did I get myself into this mess"-nervous. But that feeling is a little familiar. I remember it from getting orders to HAMILTON as OPS and MAUI as CO, from staring into the face of a new challenge, something unfamiliar, something I haven't done before. I wrote about it when I was on MAUI. The next crop of crews was starting to come in, and one of the new COs went on a familiarization ride with us during post-drydock sea trials:
One of his questions was, how do you integrate into the crew that's already in place, not knowing all of the particulars of the oparea...how do you lead without total confidence in yourself?
The funny thing is, he was actually able to articulate the question. I certainly felt the same way when I was getting ready to take over MAUI, but I wasn't so clear with myself why I was uncomfortable and uncertain. I hemmed and hawed for a moment, but then told him, "Fake it until you make it." It really was an attitude of bravado that got me through those first few weeks of wondering what the hell I was doing and why on earth anyone in a position of power would have ever though I was a good fit for the job. Eventually, I got more comfortable, mostly for two reasons, I think. First, I developed the knowledge the operational area and mission required; I studied tasking messages, did some of the specialty operations, and in general educated myself on what I was doing. Second, I just couldn't sustain the level of hypervigilance I adopted in those first few weeks. I was always on edge, always looking for the next thing that was coming along. I don't think I got complacent, necessarily, but something like it. Maybe I just grew into the leadership role.
I had a brief reminder of those first few days as we were returning from our shake-down trip yesterday. [One of our main diesel engines] failed, just [as we started our approach to the pier]. I took over driving us in. At one point, I looked at the situation and realized that I had absolutely no clue what I was doing...I'm just a wanna-be Farm Girl for god's sake, not some BAMF (as my room-mate calls me) war-fighter. How the *hell* was I gonna get us out of this mess?! I thought about it for a moment, and realized that I had no choice...there was no one else with us that I could turn the mess over to, and expect a better outcome than if I just did it myself, even with my extreeeeeeme discomfort with where we were at. I balled up, and faked it until we made it in.
And then took myself off to my office for a few minutes to physically stop my hands from shaking. But, if you can spare me a moment of egotism, I did an awesome!!! job getting us safely home. It was graceful and it looked good. I really did look like I knew what I was doing.
Ha ha ha ha ha ahahahaaa. That's the funny part!
But isn't that what this life is all about...facing the next challenge, stretching myself to discover if limits exist?

Sunday, November 6, 2011

Treasures Unearthed

The weather-proofing guys are scheduled to come on 2 December. And for some reason (probably because I'm a tightwad), I said I would make sure the spaces were cleaned up and ready for the crew. This means two things, really: I have to remove all the deck boards and roof cardboard lining in the attic and I have to clean out the crawl space. As Drew of DRO Enterprises, the company doing the work, said, the only thing left down there should be dirt and the sump pump.

So last night I resolved that today would be the day I would get down into the crawlspace. I had a plan in mind: coveralls and watch cap to keep the creepy-crawlies out of my hair and clothes, headlamp and hanging work lamp to illuminate all the spooky corners, an old laundry basket to load up rubbish from the far corners of the space, and early in the morning before it got too warm so that all the bugs, spiders, and other heeby-jeeby-making critters were still sluggish and not tempted to mess with me. And gloves.

It was pretty icky. Wet and muddy, cobwebs all in my face. I also realized that the electrical situation down there is downright scary; some wires are extremely corroded--I'm hoping these are not the hot wires. But I'd really like to get an electrician to check it out and clean it up before it all gets sealed in by the weatherproofing guys. Any of my DC-area readers have a recommendation for a good electrician?

Besides the scary electric set up, there were rotten boards, pieces of bricks and cement blocks, rusted pieces of mystery metal, an entire roll of the paper that goes on a roof underneath the asphalt shingles (the top few layers were disintegrated), pipe scraps...and these bottles:


There are four gallon jugs (one with the original cork still in it), a half gallon jug, a quart bottle and then all the other random glass pieces. I particularly like the little spice jar (bottom left) that has it's cork. And the Shaefer's beer can...I know it's not glass, but it was just too classic to put in the garbage. The square bottle (front and center) is pretty cool too.

I'll clean them up over the next few weeks (it's a good project for taking on between reading articles for class). The house was built in 1936, so who knows how long they've been down there. But finding these cool surprises definitely made a gross chore a little more of a treasure hunt.

Tuesday, November 1, 2011

Shipyard Conflict, Part II

At the end of the last post, I had just figured out the more specific Goals/Objectives (Q3 in the Circle Chart) to meet the overall goal of getting the ship working again.

"Options: Actions that address the issue:" Q4 in the Circle Chart asks for action steps to address each of the specific goals from Q3. I think I have to reorder the goals for this part to be most effective.

--Scope of the misalignment: Determine the scope of the misalignment
  • Measure the gaps between the shaft and the bearings with spacers (I know that's not the right term, but I can't remember what the tool was called), performed by shipyard personnel
  • Measure the gaps with lasers, performed by subcontractor/specialist
What actually happened: We did both, chewing up about three days arguing about whether the shipyard's measurements were accurate enough (shipyard said yes, CG said no), and then arguing about the necessity for the laser measurements. Thankfully the specialist was able to come out the night after the decision was made to hire him.

--Old ship: Make her work again
  • Attach the shafts and run the ship without further intervention
  • Attempt to move the engine blocks sufficiently to get the shafts to align; this option would not require the ship to be re-drydocked
  • Re-drydock the ship and methodically realign the shafts starting where they attach to the engines
What actually happened: Once we knew the scope of the problem, the only acceptable course of action was to re-drydock the ship. It took about two weeks. Most of the work was done at night so that the workers could see the lasers better. MKC and other engineers went to working more of a third shift, starting at about 2200, and staying until about 0300. And then came back in to the office about 1000 to contribute to the day work efforts.

--Poor comms: Improved comms between the CG and contractor
  • Have a face-to-face meeting to discuss each sides' interests
  • Ensure work item specifications are clearly written and not missing critical steps
  • Commit to having all relevant parties (KO, PE, VP and maybe even shipyard President) attend the weekly progress meetings
What actually happened: Well, we had the meeting...remember, that was the one where I lost my composure and yelled at the President. Yeah, that went well. I think the most useful action item here would have been to make sure that everyone that needed to be at the weekly progress meetings were actually there. Lots of times, it was only MKC, me or XO and the shipyard Project Manager at the meeting. That's nothing against the KO or PE, I know they were busy, busy, but the more contentious the issues got, the more important it was to have decision makers in the same room.

--Distrust: Improved working relationship between the ship and contractor
  • Review contractor's past performance to either substantiate or negate the feeling that the contractor "always" did bad work at a higher cost
  • Step to their side: try to see things from the other sides' point of view
What actually happened: This was mostly *my* issue. When I was XO on WASHINGTON, we went into drydock in the other shipyard on the island, and I didn't have a good experience there either. I always felt like they were trying to put one over on us, cutting corners and mismanaging work lists which caused us to be delayed getting out by about 10 days. I had heard horror stories from other ships about their experiences also. All of that wrapped up in my head to paint a really bad picture. But when I went back and looked at the lessons learned from all of those availabilities, the data just wasn't there to support that the contractors were "always" late and "always" over cost.

--Poorly written specs: Provide better guidance to contractor
  • Be particularly careful and specific with the specs for the re-drydocking/re-alignment effort 
  • Submit feedback to SFLC/PBPL on each of the specs we used to improve their spec templates
What actually happened: I think we did both of these.

--Scare resources (both CG and shipyard): Determine best value of contract, both in terms of time and money
  • Each party commit to responding quickly to the other side's proposals; make resolution of this issue a priority
  • Mutually agree to goal of fixing the ship for the long term
What actually happened: This is a tough one. I feel like I'm being very partisan with determining action items here, looking only at it from the ship's point of view. In the end, I don't remember how much we paid for the re-alignment fix. It's probably somewhere in the database.

--Crew fatigue: Get the ship working quickly...actually, I think this should be "give the crew some respite"
  • Maximize time off for crew while ensuring necessary personnel are onboard the ship
  • Manage the worklists to allow crew to rotate home for a few days
  • Have a morale day
What actually happened: XO did a great job of getting people back to the Big Island, at least for a couple of days at a time. I think we were all still fed up with Waikiki and the commute, but there was light at the end of the tunnel. I remember worrying about MKC, though, because his worklist wasn't getting any shorter, and he was on that crazy third shift schedule.

--Cause of mis-alignment: Determine responsibility for mis-alignment
  • Both parties acknowledge their own contribution to the situation
What actually happened: I think the only reason that this particular issue really mattered was to determine who should pay for the required repairs. But, really, both parties were responsible for the mess we were in...the CG's specs (in retrospect) were poorly written because they didn't require alignment measurements taken before the ship went on the blocks; upon realization of the amount of metal that had to be replaced, we didn't address the potential for the ship shifting on the blocks until it was much too late; the shipyard didn't recognize the risk either and didn't think to take steps to mitigate it. So, assigning blame just injects contention back into the situation.

Whew. Five more elements to go.

"Standards of legitimacy: Identify objective standards by issue; may include a fair process:" All the manuals and instructions make this one fairly easy in this case...there's guidance on nearly *everything* in the Coast Guard.
--Old ship: Naval Engineering Manual (NEM) is the easiest one to reference, though there are also CFRs (Code of Federal Regulations) and IMO (International Maritime Organization) requirements for making sure a ship is constructed and maintained safely
--Scope of mis-alignment: industry standards, NEM
--Poorly written specs: also industry standard
--Scare resources: government estimates for cost of work items, contractor estimates, what other contractors charge for same work
--Crew fatigue: Cutter Employment Standards, DAFHP/perstempo standards
--Poor comms: the contract itself specified the standard for weekly progress meetings
--Distrust: previous contractor performance, contractor performance throughout the country
--Cause of mis-alignment: umm, basic theories of physics?

"Alternatives: list alternatives and check 'best alternative to a negotiated agreement' (BATNA):"
--Party #1 / KISKA

  • Run the ship without repairs -- BAD, BAD, BAD
  • Let the negotiations run their course and have current contractor make repairs; document, document, document the contractor's performance for consideration in future contract awards
  • Tug the ship over to the other shipyard on the island and have them make the repairs
  • Tug the ship back to the CG base in Honolulu, hire own alignment specialist and sue the pants off the shipyard for breach of contract -- This is probably the ship's BATNA, but it's a fairly weak one because the ship's case against the contractor is mostly circumstantial
--Party #2 / Shipyard
  • Just wait it out...the CG needs their ship back; they'll pay up eventually -- This is probably the contractor's BATNA...and a pretty good one, dag-na-bit!
  • Sue the government for breach of contract
"Relationship:" 
--How is it today? Going in to that meeting, pretty bad - at least from my perspective. I didn't like them, they didn't like me. 

--How should it be? At the very least, professional, with some level of respect on both sides.

--What steps can we take to get there, starting today? First, I needed to let go some of my antipathy towards them as contractors in general, and crooks in particular. But they also needed to recognize us as professionals, instead of just a government cash cow who they knew they could squeeze more money out of. 


"Communication: Problems and Opportunities:"
--What information is lacking or not sufficiently understood? Initially, the big unknown was the scope of the mis-alignment...how bad was it? Once we answered that, the question was, how long would it take to fix it?

--What information would I like the other party to know? The consequences of running the ship with mis-aligned shafts...I mean, worst case scenario, the shafts vibrate badly enough to ruin the bearings, struts and housings (again, not sure if that's the right term), causing the engine room to flood.

--Am I listening to and hearing what the other party is saying and does s/he understand that I am listening? Nope, not happening. You mean, I'm really supposed to listen that line of crap that we should just  put the shafts in and run the ship...*hopefully* it will work?!? He totally lost my attention there, to a fog of frustration, anger and helplessness.

"Commitment: what agreement do I want at this negotiation session and in the long run?"
--Define the agreement sought at the end of this negotiating session (e.g., define issues, establish the process for negotiating an agreement, a detailed list of action items - what parties will or will not do, next meeting date and agenda): If I were doing this exercise before that fateful meeting, I think I would have wanted a definitive plan of action made up of aggressive steps to fix the problem. The most useful thing that could have happened at that meeting would have been agreement on the "cause of mis-alignment" issue--that both parties contributed to the problem, instead of each side posturing that they were faultless, blaming the other side. Jeez, that was *such* a waste of time!

--What are the elements of a long-term agreement? Decision on a work item, including how to fix the alignment, how long it would likely take, and how much it would cost.

--Can the parties perform the terms of the agreement? The shipyard needed a sub-contractor to do the laser alignment and the CG's ability to pay for the repairs was in question, it being the end of the fiscal year and all. But really, there were no other viable options for getting us out of there.

--Does the agreement cover the significant issue? In the end, yes, we came to resolution. But it definitely could have been done more quickly and with less contention.

--How will the parties handle problems as they arise during implementation of the agreement? Having a meeting with all the relevant parties involved. As I recall, once we got started, things went along fairly smoothly.

So, in the end, I've accomplished my goal of understanding the negotiation framework a little better by using a scenario with which I am familiar. I don't think I did an overwhelmingly good job of being non-partisan about my analysis, though. I just can't seem to get a good understanding of the contractor's perspective that makes any sense to me. Is being aware of that blind spot at least a start?

I didn't enter this exercise thinking that I was going to solve contractor/government relations for all times. It's definitely a work in progress, especially out in Hawaii. But the rumors I heard from over the summer make it sound like it's going in the right direction...for the government (maybe not so much for the contractor). Something about accountability and Contractor Deficiency Reports. I don't know. I do know that I am still holding on to a lot of frustration about the time KISKA spent in the shipyard. But that's probably a subject for another post. Or maybe not. Maybe I just need to let it go.

Tuesday, October 25, 2011

Shipyard Conflict, Part I

I'm a coupla days overdue for a post. And this post is going to serve double duty as the beginnings of a paper for class. Such a slacker! I'll even be asking for help from the audience on this post: Uncle Heathen and Aunt Jan B, if you could assist with your conflict resolution knowledge; and Frank and Greg (or any other KISKA crew from that summer!), any comments or insights on interactions with the contractors would be much appreciated.

My negotiation of choice, which of course has already been completed, will be the circumstances regarding KISKA's shaft alignment problem at the end of the 2009 drydock availability. My most impressioned memory from that experience is attending a meeting 'long about day three or four of sitting at the pier with a broken ship (over the weekend, I'm pretty sure) where we sat down with the contractors and tried figuring out the way ahead. The company President, VP and Project Manager were there for the shipyard; the Contracting Officer (KO), Port Engineer (PE), myself, my XO and my MKC were all there for the Coast Guard. The KO got the meeting going but the President quickly took over the discussion (note: I distinctly remember him using the two words in quotations), contending that the shafts weren't too badly out of alignment, there was generally some "slop" built into the design of the shafts and bearings, and "hopefully" we'd be fine to go ahead and run the ship the way it was. I nearly came across the table at him. Was he KIDDING? I think my exact words were something like, "'HOPEFULLY?!?' Hopefully is not good enough when you're talking about something that spins at 1500 rpms. This ship is not like your old tug boats and fishing boats; this is a high performance machine, more like a Corvette than a tractor. 'Hopefully' isn't good enough!" The KO, PE and Project Manager all kind of stared at me slack-jawed while MKC and XO sat there smirking. Not my finest moment, but I was *furious!*

So I think there are some good lessons for me to learn from looking at this conflict more closely. The obligatory disclaimers: this is my perspective as I try to use the example as a useful learning tool to explore the negotiation framework and meet the objectives of my class. I will do my best not to cast unwarranted aspersions on any of the parties involved. The beauty of this exercise is that I can look back with the benefit of hindsight. I will do my best to "step back from the conflict," but do reserve the right to make snide asides...wait, that doesn't sound very productive. Will try to limit the partisan commentary. Now, onward ho!

From the syllabus for Managing Conflict, the paper we're supposed to write is described as follows: "Students are to demonstrate mastery of interest-based (principled) negotiation by completing an analysis of a two-party conflict. The paper must use all nine elements and detail the type(s) of conflict strategies present. The paper must demonstrate the capacity to step back from the conflict, analyze the situation from all perspectives and then draw some conclusions. A justification for one’s point of view is not an acceptable analysis. The topic may be a negotiation that has already been completed or one that is still in progress." I'm using Getting to Yes, and Getting Past No as primary references.

The nine elements referenced in the syllabus are: framing the issue, parties and interests, significant issues, options, standards of legitimacy, communication, commitment, alternatives, relationship. There are various tools we've learned to get into each of these elements more thoroughly. Unfortunately I haven't figured out a coherent way to move through the tools so I think I'll just have to bounce around and try to explain as I go.

"Framing the Issue: What is this Negotiation about, both as I see it and as others see it?" I'm going to start by using the Circle Chart (there's a diagram about halfway down this page), which used in an integrative manner (as opposed to a partisan manner) helps to develop a "richness of options," as the professor, Dr Field says. The lower left quadrant of the Circle Chart asks, What is the problem? What are the symptoms? What is the preferred state, or long term vision? In this case, the problem was that, back in August, 2009, KISKA was not operational, despite nearly five months in drydock and close to $2 million spent on repairs. The symptoms were mis-aligned shafts. The preferred state was to have an operational cutter. I think that all the parties would have agreed with those statements, but *only* with those statements because any further interpretation of them is rife with disagreement.

"Parties and Interests: includes all significant parties who are at the table or are not, but will affect the outcome/implementation." Because this paper is about a two-party conflict, the simple list of the parties is KISKA and the contractor. But of course there were other parties involved, including KISKA's crew, Sector Honolulu and their other surface assets, MLCPAC/SFLC-PBPL (because this happened right as the Product Line was being stood up...not that that added to the confusion at all. Nope, not at all.), and the KO I think that's a good enough list to get the point. Now for their interests.

KISKA and her crew: I make the distinction because I think we, the crew as individuals, had many overlapping interests with KISKA, the operational unit, but there were also some interests that were divergent. Operationally, our interest was in getting the ship back to a working status as soon as possible in order to be able to contribute to mission execution and relieve the operational burden on Sector Honolulu's other surface assets. The crew (me included) wanted the ship back together so we could go home. There were concerns about crew fatigue, both with the extra work associated with fixing the shafts, but also the work that was still yet to come because we had a double generator change-out planned immediately following the drydock. KISKA was interested in getting the repairs done correctly to prevent any future problems with the shafts that might affect operational readiness later.

Sector Honolulu and their other surface assets: their major interest was in getting all their surface assets back to an operational status so they could meet their mission requirements...and not have to send anymore messages that put them on the spot for not being able to do certain escorts because they simply didn't have the assets available. But I think they also had a longer-term interest in documenting the paucity of assets to bolster their argument for faster delivery of new assets as the assets come available. Sector Honolulu also shared KISKA's concerns for crew fatigue and personnel tempo (PERSTEMPO) issues. Our Days Away from Homeport (DAFHP) that year were out of control, and required Sector Honolulu to submit a waiver...more paperwork and effort.

MLCPAC/SFLC-PBPL: They're responsible for the long-term functionality and cost of maintenance for the patrol boats, so they had a significant financial interest in the proceedings. But they also answer to the operational commander, so they knew they needed to get the boat back to an operational status as quickly as possible. But they also needed to maintain a good working relationship with the contractor because the chances of them having to work with the contractor again was pretty high...being that there's only two shipyards in Hawaii that work on CG ships. And they had their own internal thing going on with the aforementioned stand up of the Patrol Boat Product Line.

The KO: his interest was in getting the best value for the government's dollar, which balances cost with contractor performance. He wanted good performance at a low cost, as much as possible. But he also needed to be concerned about getting the ship fixed quickly. He was definitely interested in maintaining a good working relationship with the contractor in order to not jeopardize future interactions.

So that's it for the parties whose positions I actually have some insights into. But there's still the contractor's interests left to explore. That's where Choice Charts come in. The Currently Perceived Choice Chart asks a particular question to which the party is saying definitively "NO" and asks what are the pros and cons of that decision. The question I formulated for the contractor was, "shall we make alignment repairs to KISKA under the current scope of work?" If they say "yes" to this question, the negative consequences outweigh the positive consequences for them; if they say "no," the positive consequences outweigh the negative consequences for them.

Currently Perceived Choice Sheet
If they say "yes":
(-) They will lose money, both in terms of paying their employees for the work, the space the ship took up in the yard, and the opportunity costs that preclude them from working on other ships if they're working on KISKA.
(-) They will set a bad precedent for expanding the scope of work
(-) It may appear that they are admitting poor workmanship and (related to the next item)...
(-) It may impugn their reputation as a quality shipyard (snarky comment deleted)
(+) Improves their potential to get more government contracts in the future
(+) It gets KISKA (and by extension, me!) out of their shipyard faster (shoots, I would have thought that would have outweighed *any* other consideration!)

If they say "no":
(+) It allows them to explore more opportunities for gain under continued contract negotiations
(+) There is not precedent set and the original contracted scope of work is preserved
(+) They won't lose as much money
(+) It does not require them to admit any responsibility for poor quality workmanship
(-) They may jeopardize the potential for future government contracts
(-) The ship (and by extension, me!) will be in their shipyard for longer

The second part of the Choice Chart is the Target Balance Sheet, which lists the consequences the party might face if they are offered an alternative plan, Plan X, that is as-yet undetermined but offers terms for which their positive consequences for saying yes outweigh the negative ones. If they say "yes" to this proposal, the positive consequences outweigh the negative consequences; if they say "no", the negative consequences outweigh the positive consequences.

Target Balance Sheet
If they say "yes":
(+) They will be fairly compensated for their work, time and space
(+) They maintain their reputation as a quality shipyard (snarky comment #2 deleted)
(+) They preserve the potential for future government contracts
(+) They maintain the integrity of contract law
(-) They may not get as much money as possible
(-) They may have to admit some culpability for the alignment problems

If they say "no":
(-) They may be sued by the government
(-) They will lose money
(-) They may lose future government contracts
(-) They may be perceived as petulant and uncooperative by other future customers
(+) The may be able to hold out for more money

So based on all this, I'll summarize the contractor's interests as maximizing profit, preserving their reputation as a quality shipyard (snarky comment deleted, again), and maintaining customer relations with the government and other potential customers.

"Significant Issues that must be addressed in this negotiation:" The second quadrant (upper left) of the Circle Chart helps to identify the theoretical underlying causes of the problem, in essence, diagnosing the symptoms. The causes I identified were:
--KISKA was an old ship with lots of deferred maintenance
--There were poor communications between the Coast Guard and the shipyard
--There was a significant amount of distrust towards the contractor by the ship (or maybe that was just me)
--The contract specifications were not specific to the ship's situation (non-MEP'd ship with lots of metal fatigue issues)
--There was disagreement on the cause of the mis-alignment (the shipyard said the shafts weren't aligned when we got there; the CG said all the metal cropped out and replaced caused the ship to settle differently while on the blocks)
--There was disagreement about the scope of the mis-alignment (the shipyard said it wasn't that bad; the CG said it was out of tolerance)
--There were scare CG resources including time (scarcity of other Sector Hono surface assets) and funding (it was the end of the fiscal year...we already had a coupla scares that something or another wasn't getting funded because MLCPAC/SFLC-PBPL was out of money)
--There may also have been resource issues at the shipyard, in terms of space and time
--The crew was *tired* of being in the shipyard, of being away from home, of a two hour commute back to the hotel, of eating meals out in Waikiki restaurants, of having a beautiful ship that didn't work

The Circle Chart third quadrant (upper right) asks for more specific goals and objectives to be assigned to each of the issues; it is a refinement of the preferred vision. Dr Field had us briefly work through the Circle Chart in class as he taught us about it. We worked on our own for a few minutes and then shared what we had with a classmate for feedback and coaching. I was good with the first two quadrants, no problems getting those things verbalized. But somehow moving on to the third quadrant...I just couldn't figure out how to get there. My ship was BROKEN, I wanted it FIXED! How much more *refined* can you get?!? I could refine the statement with a few choice expletives, but I didn't think that was quite the point.

Dr Field then suggested that I break away from the contractor/ship conflict, and use the Circle Chart to explore my own conflict. Quadrant 1 (Q1): problem - I was stuck; symptom - I couldn't figure out how to wrap my head around moving past diagnosing the issue; long-term vision - I wanted to be unstuck. Q2: diagnosis - I have a huge emotional investment in my position as CO; my own frustrations with having a broken ship made it impossible to step far enough away from the issue to be objective. Q3: refined objective - find the emotional detachment necessary to make an unbiased assessment of the situation. Q4 (sorry to jump ahead...I will come back to explain Q4 more fully, but basically it lists options to meet the Q3-specified goals): recognize that the emotional investment exists and acknowledge it for the value it provides me (the ability to be passionate about being a CO, the commitment necessary to do my job through tough times and difficult challenges); admit that that commitment can precipitate blind spots in my world view; allow myself to be mad about the whole damn thing, but then GET *OVER* IT!! and get on with business.

As self-aware as I like to think I am, going through this secondary Circle Chart proved to be what I needed to make sense of my mental block.

The funny thing is, the breakthrough I needed wasn't a substance issue, it was a procedural issue. Q3 asks for an objective to be specified for each issue. I was lumping them all together still, but they have to be broken out individually and "re-goaled." Issue: Specific goal
--Old ship: Make her work again
--Poor comms: Improved comms between the CG and contractor
--Distrust: Improved working relationship between the ship and contractor
--Poorly written specs (actually, I think this really contributed to the poor comms and distrust issues): Better guidance provided to contractor
--Cause of mis-alignment: Determine responsibility for mis-alignment
--Scope of the mis-alignment: Determine scope of the mis-alignment
--Scare resources (both CG and shipyard): Determine best value of contract, both in terms of time and money
--Crew fatigue: Get the ship working quickly

I think I'm going to stop here for now. The paper's not due til mid-November, and I've got some other projects I need to work on. Will try to finish this up within the week.